The east missionary apartment is nearing completion with the tile being laid and the finishing touches being done on the walls and the kitchen.
This picture shows the chapel area that is being prepared for tile and is the staging area for working on the steel for the upper floors.
This picture shows a team of workers, the baby included, working to apply the stucco near the east stairwell on the second floor.
Here is a team of welders preparing the roofing supports for the main building. These men are working without diligently to finish the supports in a timely manner.
Here is another picture of the welders.
This picture shows the exterior of the chapel area with its fresh coat of paint.
This picture was taken in one of the second floor classrooms. The view over the rice fields is very beautiful and the breeze coming over the fields will cool the room nicely for our students when they study in this room.
This picture shows one of the Khmer staff apartments on the second floor. The alcove on the left will be a closet and the door on the right leads to the small kitchen and bathroom.
This picture shows the workers applying the stucco on the rear of the dining hall and kitchen area.
This picture shows one of the laborers working on the walls under the counters in the kitchen area.
This picture shows the workers erecting the scaffolding on the exterior of the chapel. They will be applying the stucco in the coming weeks.
This is a picture of the side of the chapel and dining areas. As you can see, the windows and walls are complete and the roof in nearing completion.
This is a picture taken on the third floor that shows the forms for the headers that have been prepared. The contractor said that they would be pouring the concrete in the next few weeks.
This is a picture of the inside of one of the guest staff housing that is located on the second floor.
This is a up close view of the roofing support system that was installed by the contractor and his team of laborers.
This picture shows the interior of the chapel area.
This picture was taken on the second floor. It shows the progress that has been made on the exterior hallway and the second floor classrooms and housing.
This final picture shows the west stairwell with the adjoining storage space.