Wednesday, July 30, 2008

July 18th, 2008

As you can see from the picture above, the walls are nearly complete for the chapel, and the workers have begun fabricating the support beams for the roof. Also, they have begun laying brick for the walls on the second and third floors


All of the work for the fabricating of the roof support beans is being done on site to finish the roof of the chapel.


Additional welders and laborers have been hired on to complete the task of constructing the roof of the chapel.


This is a picture of the offices on the first showing the work that has been completed on the walls and the ceilings. The bathrooms are also complete.


This is a picture of the second floor after the support beams have been removed. Construction of the walls for this floor has begun.

Tuesday, July 8, 2008

July 3rd, 2008

A picture of the new building in the afternoon sun.


The chapel area prior to the workers beginning to lay the bricks for the walls.


A welder making the windows for the rooms that can be seen in the background.


A workers stuccoing the walls in the missionary housing the lower level.


Workers cutting tile for the kitchen bathrooms.

June 18th, 2008

A picture of the building and the rig that is used to pump concrete to the upper floors.


Our contractor, Luk Trii, overseeing the workers.


The laborers working with the concrete after it has been pumped to the upper level.


One of the workers smothing the concrete for the flooring after it has settled into all of forms.

June 10th, 2008

The dining hall and chapel.


The main section of the building, 1st and 2nd levels.


The completed exterior bathrooms on the western side of the building.


Bathroom sinks.

May 1st, 2008

The northwest corner of the dining hall.


The dining hall and the chapel area taken from the front of the building.


The first and second floors of the main section of the building.

April 1st, 2008

For this update, we wanted to include a picture of the worker housing that is located along the eastern wall of the lot.

March 3rd, 2008

After all of the dirt was backfilled, the workers began to construct the pilings and the walls.


Here are several of the forms for the pilings for the first floor. This picture was taken in the area of the building that will be the library.

February 14th, 2008

As the construction continued, the workers prepared the forms for the concrete girders.


Here you are seeing a finished girder for the front face of the school

February 9th, 2008

Preparing the steel covering the septic tank.


Women preparing the steel that strengthens the pillars.


In order to back fill the foundational holes, the contractor hired a front end loader.


Here is a picture of the foundation for the chapel and dining hall area of the new school.

January 19th, 2008

The workers continued to prepare the foundation for the school.


Another picture of the developing foundation.

January 15th, 2008

The workers are continuing to prepare the foundation for the school


Here you are seeing them preparing the beams and the foundation.


Another picture of the foundation of the school.


A picture of the supports for the foundational holes.

January 5th, 2008

After the holes were dug for the foundation, the workers began to line them with rock and cement.


Here is a picture of the water tank a some of the bricks that will be used to build the school.


As the construction is beginning, the site will continue to be littered with piles of dirt, tools, concrete mixers, and other construction materials.

Groundbreaking Ceremony

This is a picture of the pastors who attended the Groundbreaking Ceremony at the New Lot in November.


Here is a picture of Tiffany and Tim Gallant during the groundbreaking ceremony.


Our Area Director Dr. Romy Caringal attended the ceremony. He is pictured here with our Misison Director, Rev. Jun Rafael.


During the Groundbreaking Ceremony, we bathed the construction of the new school in prayer, and dedicated the school to God.