Tuesday, December 2, 2008
12-2-08 Building Update
Here is another picture from the rear of the building.
Here is a picture taken from the front of the building, showing the great progress that the contractor and his team are making on the building. The dedication is set for January 9th.
Monday, October 20, 2008
October 2nd, 2008
The east missionary apartment is nearing completion with the tile being laid and the finishing touches being done on the walls and the kitchen.
This picture shows the conference room which will hold meetings of the WBI staff and the DBA in the future. This room had a dirt floor just one week earlier, showing the great gains that the contractor and his team are making each week.
These workers are laying the tile on the front hallway on the second floor of the school building.
This picture shows the chapel area that is being prepared for tile and is the staging area for working on the steel for the upper floors.
This picture shows a team of workers, the baby included, working to apply the stucco near the east stairwell on the second floor.
Here is a team of welders preparing the roofing supports for the main building. These men are working without diligently to finish the supports in a timely manner.
Here is another picture of the welders.
This picture shows the exterior of the chapel area with its fresh coat of paint.
Thursday, September 25, 2008
September 25th, 2008
This second picture of the school shows the view that will be presented to a visitor when they come through our gate and see the new Wesleyan Bible Institute.
This picture shows the scaffolding and the paint on the exterior of the chapel.
We are very pleased with the way that the red roof complements the white walls on the exterior of the building.
This picture shows the interior of one of the staff housing units where the walls and floor are nearing completion and the tile is ready to be laid.
The workers are also applying the stucco to back side of the school.
This picture shows the exterior of the main building complex where, in the future, you will see staff and students moving along these walkways on the way to the offices, to classes or to a chapel service. It is exciting to dream about that day.
Sunday, September 14, 2008
September 14th, 2008
Here is another picture of the front of the school building, showing more of the chapel/dining hall complex.
A view from the west side of the building.
The roof for the chapel is nearling completion, with just a small section on the rear of the chapel, not shown here, being left to be completed.
Having the roof in place makes the chapel seem very spacious.
The scaffolding surrounding the exterior of the chapel.
The third floor will hold the student housing. Here you are seeing one of the dorm rooms that is still under construction.
A picture of Pastor Kimsan and the contractor Mr. Trii surveying the third floor.
The east missionary apartment is under construction. This worker is preparing the bathroom and the kitchen for the electric and the water systems.
This picture shows conduit snaking its way across a floor that is waiting for the floor tiles.
The toilet mains are being prepared for the bathrooms in the east missionary apartment.
These workers are applying the stucco to the underside of the gutters on the chapel.
Workers installing tile and countertops in the kitchen off of the dining hall.
Workers applying stucco.
Pastor Kimsan and the contractor surveying the interior of the chapel.
A laborer is applying paint to the interior of one of the staff housing units on the second floor.
Tiffany and Losithon, the wife of Pastor Kimsan, having their picture taken in the kitchen of one of the staff housing units on the second floor.
Monday, September 1, 2008
September 1st, 2008
This picture was taken in one of the second floor classrooms. The view over the rice fields is very beautiful and the breeze coming over the fields will cool the room nicely for our students when they study in this room.
This picture shows one of the Khmer staff apartments on the second floor. The alcove on the left will be a closet and the door on the right leads to the small kitchen and bathroom.
This picture shows the workers applying the stucco on the rear of the dining hall and kitchen area.
This picture shows one of the laborers working on the walls under the counters in the kitchen area.
This picture shows the interior of the area that will be the library of the school. However, at this time, it is being used to store the plumbing materials for the building project.
Thursday, August 21, 2008
August 22nd, 2008
This picture shows the workers erecting the scaffolding on the exterior of the chapel. They will be applying the stucco in the coming weeks.
This is a picture of the side of the chapel and dining areas. As you can see, the windows and walls are complete and the roof in nearing completion.
This is a picture taken on the third floor that shows the forms for the headers that have been prepared. The contractor said that they would be pouring the concrete in the next few weeks.
This is a picture of the inside of one of the guest staff housing that is located on the second floor.
This is a up close view of the roofing support system that was installed by the contractor and his team of laborers.
This picture shows the interior of the chapel area.
This picture was taken on the second floor. It shows the progress that has been made on the exterior hallway and the second floor classrooms and housing.
This final picture shows the west stairwell with the adjoining storage space.