Sunday, September 14, 2008

September 14th, 2008

As can be seen from this picture, the major accomplishments for this update are the roof for the chapel and the stucco on the exterior of the chapel.


Here is another picture of the front of the school building, showing more of the chapel/dining hall complex.


A view from the west side of the building.


The roof for the chapel is nearling completion, with just a small section on the rear of the chapel, not shown here, being left to be completed.


Having the roof in place makes the chapel seem very spacious.


The scaffolding surrounding the exterior of the chapel.


The third floor will hold the student housing. Here you are seeing one of the dorm rooms that is still under construction.


A picture of Pastor Kimsan and the contractor Mr. Trii surveying the third floor.


The east missionary apartment is under construction. This worker is preparing the bathroom and the kitchen for the electric and the water systems.


This picture shows conduit snaking its way across a floor that is waiting for the floor tiles.


The toilet mains are being prepared for the bathrooms in the east missionary apartment.


These workers are applying the stucco to the underside of the gutters on the chapel.


Workers installing tile and countertops in the kitchen off of the dining hall.


Workers applying stucco.


Pastor Kimsan and the contractor surveying the interior of the chapel.


A laborer is applying paint to the interior of one of the staff housing units on the second floor.


Tiffany and Losithon, the wife of Pastor Kimsan, having their picture taken in the kitchen of one of the staff housing units on the second floor.